EDINBURGH 20-MILERS

You are welcome to join our easy-paced bike rides. Click here for all the information you need.

Pages

Showing posts with label NCN 1. Show all posts
Showing posts with label NCN 1. Show all posts

Saturday, 13 September 2025

Dalkeith Delights

Our destination for today's run was Dalkeith. That's somewhere the group often ride to – we visited it as recently as last April. But this time, under Alison's leadership, we managed to add a little variety to the route with a couple of interesting variations.

Nineteen riders turned up, including three newcomers – all very welcome. The first eight or nine miles were on familiar territory: the Innocent Path, Bruntstane, Newcraighall and Musselburgh Station, then on the new-ish bike path to Monktonhall and then onto the River Esk walkway. We paused for the customary breather at the top of the stiff climb up to Cowpits, then on through Whitecraig and the bike path past the Dalkeith school campus and along Salters Road.

Normally we would head straight into Dalkeith town centre from this point. But this time we turned off the road just before the bridge over the South Esk, taking a pleasant path through Waterfall Park. After crossing the Maiden Bridge, we continued through the woods next to Newbattle golf course. This is really a delightful spot. We normally approach it on the return leg from Dalkeith. Seeing it from the opposite direction made a welcome change.

The final leg of the morning took us across the busy Abbey Road and so into King's Park for our lunch stop. A few of the group headed to the nearby supermarket cafe, while most settled for a picnic lunch in the park.

Up to now the day had been dry, sunny and reasonably warm. But as we saddled up for the return leg, clouds started to appear and a few drops of rain were felt. This continued as we cycled through Dalkeith town centre. By time we reached the entrance to Dalkeith Country Park, the rain was much more in evidence, so we paused in the Restoration Yard to give those who hadn't already done so a chance to put on their waterproofs.

Re-opened gate


When cycling through Dalkeith Country Park, we normally head for the gate in the north east corner by Smeaton Farm. This takes us onto a busy stretch of road towards Whitecraig. This time, we were able to avoid the traffic by turning left just before the gate, taking a winding route through pleasant farmland to another gate, at Old Craighall. Older members of the group will remember that this used to be our normal route out of the park, but that gate was closed in 2013 and remained closed until a few weeks ago. It was good to be able to go that way again, if only for the sake of variety.

From Old Craighall, we took a shortcut through a new housing development and were soon on the path leading back to Musselburgh Station. By now the rain had eased off and blue skies were again in evidence. For the rest of the ride, we retraced our outward route back to the Meadows.

Despite the rain, it turned out be a very pleasant run, made more interesting by the variations to the normal route. Thanks to Alison for planning the route (helped by Alan) and for stepping in at short notice to lead the ride (not for the first time this year).

Leader: Alison

Report and photos: Mike 



Wednesday, 17 May 2017

Burnshot Bridge closure: alternative route to Kirkliston and beyond


Updated: 3 August 2020

A new bridge is now in place and open to all traffic. It includes a segregated eastbound cycle lane and a shared use path for those heading west. This reinstates the original route from Edinburgh to Kirkliston. The alternative route, via the tunnel under the A90, is still available.


The Burnshot Bridge is currently closed to all traffic – including cyclists and pedestrians. This is the bridge over the main A90 Queensferry Road near Cramond Brig. It lies on the main bike route between Edinburgh and Kirkliston, and its closure is a major nuisance to cyclists travelling between the capital and parts of West Lothian.

Since this article was posted on 17 May, Edinburgh Council have established an alternative route between NCN 1 near Cramond Brig and the Kirkliston Road. This route, which is described below, is easier and safer than the other options, and has the benefit of being signposted - at least in part.

To reach this alternative route, head north on NCN 1 from Cramond Brig (this is the route that goes alongside the dual carriageway, not the longer route through the Dalmeny Estate).

The closed bridge as seen from NCN 1
After a short distance, you will see a tunnel on your left that goes under the A90 (see photo below). This is next to the public weighbridge and opposite a bus stop. Go through the tunnel. At the other end, keep on the path as it veers to the left. This takes you onto the dual carriageway - but in a coned-off lane that is reserved for cyclists and pedestrians.

It is advisable to keep well to the left as you cycle in this lane, to keep some distance between yourself and the fast-moving traffic. Also, watch out for cyclists coming towards you. Although it is not obvious, this lane is in fact two-way for cyclists.

After about half a mile, leave the dual carriageway by a slip road. This joins the Kirkliston Road just to the west of the closed bridge. You can now continue on the original route.

Coming back

The tunnel under the dual carriageway
If you are cycling in the opposite direction, that is, from the Kirkliston area towards Edinburgh, just reverse the above directions. When you reach the closed bridge, turn right down the slip road onto the dual carriageway, using the coned-off lane mentioned above. Leave the main road at the next exit and go through the tunnel to join NCN 1. Turn right by the bus stop for Cramond Brig and Edinburgh.

How long?

Nobody seems to know for how long the Burnshot Bridge will be closed. We'll post more information as it becomes available. In the meantime, feel free to post a comment if you have experience with the route described here.

Update: 13/2/18

Edinburgh Council today announced that funding has been found to replace the bridge (which was demolished last November after it was found to be unsafe.) Work on the new bridge is expected to start later this year and will last approximately two years. Meanwhile the cycle route alongside the dual carriageway (mentioned above) is being widened, with better separation from the main traffic flow.

We'll post further information about the replacement bridge as it becomes available.

Saturday, 8 August 2015

A summer ride to Dalkeith


Following a spell of changable weather; today's ride was blessed with sun shining down from a lovely blue sky. The temperature may have been slightly below the average for the time of year, but it really was ideal cycling weather. A relatively low turnout of 25 riders was a touch disappointing. But it being holiday time for many and the start of the Edinburgh Festival may have had something to do with it. Despite that, it was nice to see more new faces. We headed off in one group. Road closures brought about by the Festival meant we headed off up [rather than down] Middle Meadow Walk and took a detour to get onto the road we needed. A short while later we stopped and waited upon realising that four riders were still at the start point. A minor mechanical issue had delayed their start. It was quickly fixed and they caught us up. There was much more traffic on the road than usual and this delayed us for the early part of the ride. Leaving the traffic behind, we took back streets and paths to make our way into Holyrood Park. Despite quite a few pedestrians to contend with, we were soon climbing Queen's Drive. Turning off half way up the hill, we took a path and climbed a few steps to emerge in the back streets of Willowbrae. We whizzed down to the busy Willowbrae Road. A fortunate break in the traffic meant all of the group managed to get across in one go. We made our way to Northfield, where a few quiet roads led us into the delightful Figgate Park. Once through the park, we were soon navigating the bumpy cobbles of Brighton Place on our way into Portobello. A couple of twists and turns and we were on the busy Portobello Promenade. One rider commented that on a day like today, we could have been beside the Mediterranean. We must remember that when riding along it in January, freezing cold and being lashed by horizontal sleet. Once at Joppa, there was no alternative but to join the busy Musselburgh Road for the run to Fisherrow Harbour where we had a comfort stop.


From there we took a less familiar route through Musselburgh to join the Grove near Tesco for our run towards Whitecraig. At Whitecraig we joined the busy A6094 to reach the outskirts of Dalkeith. More twiddling through unfamiliar back streets brought us to the lunchtime pub stop. A small number of the group availed themselves of the pub's facilities, whilst the rest of us headed to the park opposite Morrisons supermarket to enjoy a picnic in the sunshine. This finally felt what summer should be like. Suitably replenished, we regrouped and headed off towards more new cycle paths through a new housing estate. The paths were great, but a difficult-to-negotiate gate delayed us as 25 riders had to get through it. Not really what you'd expect on NCN 1. All through, and the unfamiliar paths led us back to Dalkeith High School and the familiar path towards Whitecraig. Yet another detour through an housing estate cut off a stretch of busy road and we were soon back on the path to Musselburgh. Instead of following it back into town, we turned off for Musselburgh railway station. From there we made our way through Newcriaghall and Brunstane to join the Innocent Railway to return to our starting point.

It had been a good day and the weather had been kind to us. Thanks to Michael for planning such an interesting route. Its always nice to be surprised by new ways through areas you think you know well.


Leader: Michael
Report: Glenn
Photos: Michael and Glenn
Trace: Julia